You have hired the professionals to get the job done
that you want to do, and it appears as though everything is in place. Before
making the final payment, here are a few things to consider:
1. Go
back to the original plan. Can you see evidence in the final construction that
the top 5 things you wanted to accomplish have been performed? What about the 5
desirable but optional things… what is the status of those?
2. Schedule
a meeting with the Architect to perform what is commonly referred to as a ‘walk
through’. He will be able to create what is called a ‘punch list’ of items that
may still be remaining to be accomplished – things that you may overlook but
that he may catch due to training and experience. Some things may obviously
need repair or replacement. Other things may be not so obvious, but make a
significant difference. Since the Architect is the creator of the drawn
instructions for the work to be completed, he would be the objective set of
eyes that would be able to scour the construction to make sure that the plans
shown in the construction documents have been accomplished.
3. Make
sure that the performance of the ‘punch list’ items that you and the architect
have created is the source of the General Contractor’s final payment. This
final payment should be sizable enough so that finishing the performance of the
job is an incentive for the General Contractor to be paid.
4. You
should have a contingency fund for various things that are not obvious
consumables but that are necessary or even functionally important as supporting
elements. As an example, you may now have a new washer and dryer upstairs, but
do you have space or a need for a laundry hamper?
5. Be
sure to get any pamphlets or manuals from the contractor or sub for the new
appliances you may have in place; now is the time to be determining maintenance
schedules as well as having warranty information in place. Murphy’s law, as you
have been able to find out by now, applies to buildings and construction as
well.
6. Should
any difficulties arise, the first person to call will be the last person who
had any direct interaction with the item or equipment in question. The
Contractor’s warranty is for a year for all labor that was required to complete
the job. Manufacturer’s warranties vary. The Architect’s statute of limitations
is seven years related to design defects of the house or addition.
7. Realize
too that all parties involve, if reputable, want additional work. Positive
references from clients cause the workers’ reputations to grow, thereby
facilitating new jobs. If you are not happy with some aspect of the performance
of any of your team, feel free to tell them so that they may have the
opportunity to remedy the situation and insure that you are happy with the
final product.
It is only BEFORE you make the final payment that you have any capability of insuring that the project is exactly what you want it to be. Following the above seven steps can insure that your dream doesn't become a nightmare.